Discuss a project

Electrical equipment manufacturing

We make transformer substations, switchgear and compensation units in our own workshop in Tashkent.

The BIONIKA workshop makes GKTP and 2GKTP urban transformer substations, KTP and KTPB packaged substations, UKRM reactive power compensation units for 0.4 and 6–10 kV, KSO cubicles, KRU cabinets and 0.4 kV boards. The full cycle — from laser cutting and powder coating to assembly and workshop tests — on one site.

We manufacture to the customer’s questionnaire or design. We sell to companies and private customers; delivery, installation and commissioning on request.

What the work includes

What we make

  • KRU and KSO
  • YaKNO 6⁠–⁠10 kV
  • KTP and 2KTP
  • LV switchgear and main switchboards
  • 0.4 kV boards
  • UKRM and reactive power compensation units
  • Relay protection and automation cabinets
  • Control cabinets
  • Metal-clad switchgear (KRU)
  • Steel structures and auxiliary elements

Production stages

  1. 01Selection of components
  2. 02Laser cutting of metal
  3. 03Metal bending
  4. 04High-precision laser welding
  5. 05Powder coating
  6. 06Assembly of relay and microprocessor protection systems
  7. 07Equipment assembly
  8. 08Factory tests
  9. 09Preparation for shipment
  10. 10Packing

ResultEquipment ready for installation and connection.

  • KRU assembly shop
    KRU assembly shop
  • Cubicle assembly in the workshop
    Cubicle assembly in the workshop
  • A KTP before shipment
    A KTP before shipment
  • Reactive power compensation unit
    Reactive power compensation unit

Have a project?

Send us the technical specification — BIONIKA specialists will assess the project and propose a solution.