Commissioning

We test the equipment, set up the systems and put the site into operation.

BIONIKA specialists check the installation, measure insulation and earthing resistance, test cable lines and power transformers, set up relay protection and automation, and check secondary circuits, protections and interlocks.

Testing is done by our own electrical laboratory, so commissioning does not wait for outside contractors. The outcome is an integrated trial run of the equipment, test reports and as-built documentation.

What the work includes

What it includes

  • Installation checks
  • Insulation resistance measurement
  • Earthing checks
  • Cable line testing
  • Power transformer testing
  • Switchgear checks
  • Relay protection setting
  • Checks of protection and interlocks
  • Automation setting
  • Secondary circuit checks
  • Checks of control and signalling systems
  • Functional tests
  • Integrated equipment testing
  • Preparation of test reports and as-built documentation

ResultEquipment checked, set up and ready for safe operation.

  • Relay protection commissioning
    Relay protection commissioning
  • Commissioning of KRU, Angren substation
    Commissioning of KRU, Angren substation
  • Relay protection cabinets, Bibliotechnaya substation
    Relay protection cabinets, Bibliotechnaya substation
  • Mobile electrical laboratory
    Mobile electrical laboratory

Have a project?

Send us the technical specification — BIONIKA specialists will assess the project and propose a solution.