Commissioning
We test the equipment, set up the systems and put the site into operation.
BIONIKA specialists check the installation, measure insulation and earthing resistance, test cable lines and power transformers, set up relay protection and automation, and check secondary circuits, protections and interlocks.
Testing is done by our own electrical laboratory, so commissioning does not wait for outside contractors. The outcome is an integrated trial run of the equipment, test reports and as-built documentation.
What the work includes
What it includes
- Installation checks
- Insulation resistance measurement
- Earthing checks
- Cable line testing
- Power transformer testing
- Switchgear checks
- Relay protection setting
- Checks of protection and interlocks
- Automation setting
- Secondary circuit checks
- Checks of control and signalling systems
- Functional tests
- Integrated equipment testing
- Preparation of test reports and as-built documentation
ResultEquipment checked, set up and ready for safe operation.

Relay protection commissioning 
Commissioning of KRU, Angren substation 
Relay protection cabinets, Bibliotechnaya substation 
Mobile electrical laboratory
Sites
All projects
Bibliotechnaya substation
Almazar district, Tashkent
Parkent substation
Parkent
Angren substation
Angren
Sergeli substation
Sergeli district, Tashkent
MIFI substation
Mirzo-Ulugbek district, Tashkent
Uzbum substation
Have a project?
Send us the technical specification — BIONIKA specialists will assess the project and propose a solution.