Bibliotechnaya 110/35/10 kV substation

Bibliotechnaya 110/35/10 kV substation: Power transformer and 110 kV outdoor switchyard equipment

Project overview

In the photos of the site: power transformer and 110 kV outdoor switchyard equipment; 10 kV indoor switchgear with KRU cells; relay protection and automation panels; busbar entries with phase marking.

BIONIKA scope of work
  • Civil works, indoor switchgear buildings from light-gauge steel
  • Supply and manufacturing of outdoor switchyard, indoor switchgear and relay protection equipment
  • Equipment installation
  • Commissioning
Site type
Substation
Type of work
Reconstruction
Voltage
110/35/10 kV
Location
Almazar district, Tashkent
Year
2025
Photo report
September 2026

From the task to the result

  1. 01

    The task

    Reconstruct an operating 110/35/10 kV substation, replacing the power transformers with 40,000 kVA units, and fully renew the switchgear of all voltage classes.

  2. 02

    Project context

    The substation stands in a built-up area of Tashkent, in the Almazar district, and supplies city consumers over 35, 10 and 6 kV lines. The new transformers increase the capacity available to the district.

  3. 03

    BIONIKA solution

    110 kV outdoor switchyard to scheme 110-4N on block-type equipment, two new light-gauge steel buildings — 35 kV indoor switchgear and 6–10 kV indoor switchgear combined with the control building — and a new relay protection and automation system. BIONIKA carried out the whole cycle of works on site.

  4. 04

    Manufacturing

    Made and supplied for the site: 110 kV outdoor switchyard blocks (disconnectors, circuit breakers, CTs, VTs, surge arresters, neutral earthing switches), rigid 110 and 10 kV busbars, 10 KYN61-35 kV cells, 36 K-104 6–10 kV cells, relay protection and automation cabinets for transformers and lines, metering, central signalling, auxiliary supply and DC system cabinets.

  5. 05

    Installation

    Replacement of the 40,000 kVA power transformers, installation of 110 kV switchyard blocks and busbars, assembly of indoor switchgear buildings from light-gauge steel, installation of 35 and 6–10 kV cells, relay protection cabinets in the control building and cable structures.

  6. 06

    Commissioning

    Checks of secondary circuits, setting of protection and automation for transformers, 35 kV lines and 6–10 kV incomers, commissioning of metering and DC supply, energised testing of the scheme.

  7. 07

    Testing

    Acceptance tests of transformers and 110, 35, 10 and 6 kV equipment.

  8. 08

    Result

    In 2025 the substation was put back into service after reconstruction: 40,000 kVA transformers, a new 110 kV outdoor switchyard, 35 kV indoor switchgear and 6–10 kV indoor switchgear.

Specifications

110/35/10 kV · Reconstruction
Power transformers
40 000kVA110/35/10 kV, replaced during the reconstruction
110 kV outdoor switchyard
110-4NScheme, block-type equipment
35 kV indoor switchgear
10cellsKYN61, 4 cable lines
10 kV indoor switchgear
32cellsK-104, 26 cable lines
6 kV indoor switchgear
4cellsK-104, combined with the control building

Photo report

27 photos · September 2026